Active local weather warning

Coastal Flood Warning: Commercial Roof Help in Pompano Beach

The National Weather Service has issued a coastal flood warning covering Pompano Beach. Heavy rain and drainage loading can expose roof leaks, blocked drains, and ponding water. This is a weather exposure advisory; it does not establish damage to a specific roof.

Do not access a roof during hazardous weather. Protect people first, avoid water near electrical equipment, and request roofing help when conditions permit.

National Weather Service · Updated Oct 28, 2026, 9:39 AM UTC

Hurricane Damage Roof Repair in Pompano Beach, FL

The roofs that come through hurricane season best were made ready months before any storm had a name. Broward has had two hard reminders in living memory. Wilma came through as a Category 3 on October 24, 2005, and its eye, 55 to 65 miles across, passed over most of the county. Twelve years later Irma pushed gusts as high as 100 mph through the same county.

Repairing hurricane damage on a commercial roof is a different job from fixing a single leak. A storm opens dozens of weak spots at once, owners all call at the same hour, and the repair has to satisfy an insurer, a building department and the next storm. In Pompano Beach, FL we start with the dry-in, document everything, and then rebuild the roof so it is stronger than what the wind found.

Request a Roof Assessment
Hurricane Damage Roof Repair in Pompano Beach, FL

Wilma and Irma: two storms, two lessons

Design-Assist Contractor and Build Services

Wilma put a 98 mph gust on Pompano Beach and 99 at Fort Lauderdale, and roof damage was reported across Broward. With an eye that wide, wind comes at a building from one side, drops off, and then returns from the opposite direction. A roof edge loosened on the first pass gets finished off on the second, which is why we look at both sides of a building after a major storm.

Irma taught a different lesson. Most of Broward saw sustained winds of 65 to 70 mph, which is a long time for fasteners, seams and edge metal to flex and work. Damage from a storm like that is often scattered and quiet: a membrane lifted at a seam, a fastener backed out, wet insulation under a patch that looks fine. Those are the findings a quick walk-through misses and a careful survey catches. Once the survey is done, wind damage repair starts at the edges and fasteners, where uplift does its work.

Design-Assist Contractor and Build Services

Beyond the Wind: tornadoes, surge and the rain that follows

Design-Assist Contractor and Build Services

A hurricane hits a roof from several directions. Irma spun up three tornadoes in the county: a pair rated EF-1 and a weaker EF-0 that touched down near Oakland Park. Tornadoes cut narrow paths of heavy damage, so one building can lose a roof section while its neighbor looks untouched. Coastal Broward also saw about three feet of storm surge, which does not reach a roof but does soak ground floors, electrical gear and the salt-sensitive parts of buildings near the water.

The quietest damage comes from the rain. Once wind opens a membrane or lifts a panel, the rainbands moving through the same night pour water into the insulation and the rooms below. Plenty of interior loss after a hurricane is rain that came in after the wind had finished its work. That is why the first hours after the storm passes matter more than almost any decision that comes later.

Design-Assist Contractor and Build Services

First Days: dry-in, then the plan

Design-Assist Contractor and Build Services

After the storm passes and the roof is safe to stand on, we triage. A building with water pouring into occupied space goes first, then buildings with stock or equipment at risk, and then the rest. Temporary membrane and tarps go over the openings, loose metal is secured, drains are cleared, and wet insulation is marked. On wide roofs, a drone flight takes in the whole surface faster than a crew can walk it and keeps people off slick membrane.

With the building dried in, we write up the damage in order of importance, and the permanent plan follows. Demand is heavy after a storm, so timing depends on how many buildings need help, how many materials are available, and how much of the roof was affected. Each owner gets the sequence in writing, and emergency roof repair calls are answered day and night while the list is worked.

Design-Assist Contractor and Build Services

Paper and Permits: the claim and the hurricane zone

Design-Assist Contractor and Build Services

Two sets of rules shape a hurricane repair. The first is the insurer's, and a clean file helps: dated photos, measurements, a roof plan marked with damage, and a written scope. That record goes into insurance claim documentation an adjuster can follow, though the coverage decision belongs to the carrier. The second is the building code. Broward is part of the High-Velocity Hurricane Zone, so a Risk Category II building is designed for 170 mph and every exterior roofing component needs a valid Miami-Dade product approval.

Those approvals come from three test protocols: TAS 201 for flying debris, TAS 202 for pressure cycling and TAS 203 for water after impact. The 2023 Florida Building Code, 8th Edition, is the one in force for permits applied for today, and a later edition is on its way, so we confirm which one applies before ordering material. Matching approved assemblies, rather than mixing parts, is what lets the new work earn its inspection.

Design-Assist Contractor and Build Services

Tie-Downs and Edges: ready before the next one

Design-Assist Contractor and Build Services

The best hurricane repair is the one you never need. When the season is a few weeks away, a pre-storm check on the roof covers the details the wind goes for:

  • Edge metal, coping and fasteners at the perimeter, which carry the highest loads
  • Rooftop units, with panels latched and tie-downs and straps in good condition
  • Drains, scuppers and overflow outlets cleared of leaves and trash
  • Loose items, from spare panels to ladders and unused equipment, removed or secured
  • Open seams and lifted flashing, repaired while the weather is still dry

None of that has to wait for a forecast cone. It fits into a spring maintenance visit, and it costs far less than a repair done in October.

Design-Assist Contractor and Build Services

Coast to Corridor: the Fishing Village, the barrier island and Powerline

Design-Assist Contractor and Build Services

Wind exposure changes with distance from the water. Along the beach, the A1A Ocean Boulevard Corridor and its pier face salt air and open wind all year. Lauderdale-by-the-Sea sits on a narrow barrier island along A1A, with many hotels and motels. Coastal Broward is also where Irma brought about three feet of surge.

Farther inland, the industrial parks of Pompano Beach are not out of reach. Inland does not mean sheltered, since Wilma's 98 mph gust was recorded at Pompano Beach itself. Large industrial buildings, like those mapped in Powerline Industrial and Park Central, have long perimeters, and a long perimeter gives wind plenty to work on. Wherever the building sits, the repair is written for the exposure it faces.

Design-Assist Contractor and Build Services

Questions We Hear Often

Design-Assist Contractor and Build Services

How soon can a crew get on the roof after a hurricane passes?

As soon as the wind has dropped to a safe level and the lightning has cleared. Calls stack up fast, so we triage by how much water is entering the building and what sits below it, and we work down the list as crews and materials allow.

Should we wait for the adjuster before touching the roof?

Make the building watertight now. Insurers expect owners to prevent further loss, so tarps and temporary repairs are normal. We photograph the damage first and keep records, so permanent repairs can follow once the claim is in motion.

Does a roof that came through the storm without a leak still need a look?

Quiet damage is common. Fasteners back out, seams loosen, insulation takes on moisture under an intact surface, and the leak shows up months later. A survey after the season is a small cost next to the repair it can head off.

Will hurricane repairs need a permit?

That depends on how much of the roof is being replaced, and the building department has the final word. We check before work starts and use components with valid Miami-Dade approvals so the work passes inspection.

What should a building manager do about rooftop equipment before a storm?

Make sure panels are latched, straps and tie-downs are sound, and nothing loose is lying on the roof. Equipment that shifts in high wind tears flashing and cuts membrane on its way across the roof.

Design-Assist Contractor and Build Services

We pick up any day or night, and after the storm passes we work through the list as fast as we safely can. Tell us what you see and we will get the building dried in.

Storm just passed? Call us.

Storm Damage or an Active Leak? Call: 555-555-5555
Call555-555-5555